How Long Does It Take to Build Custom Software?
Where the weeks actually go, and what compresses a schedule without breaking it.
A single-purpose tool runs 6–10 weeks, a SaaS product 14–24, a marketplace 16–30 — but only if the scope holds still. Here is what decides the calendar: the four clocks every schedule has to count, the overruns that are structural rather than unlucky, and the levers that shorten a timeline by removing waiting instead of adding pressure.